UL 2580 2nd Edition - Batteries for use in Electric Vehicles
Design Testing |
Production Testing |
Dielectric Voltage Withstand Test (Hipot test) Requirement: Test Voltage = DC potential of 1.414 times twice rated voltage. *AC potential of 60 Hz at twice rated voltage may be applied instead of the dc potential Test Time = 60 seconds
Pass Criteria: There shall be no evidence of a dielectric breakdown
|
Dielectric Voltage Withstand Test (Hipot test) Requirement: Test Voltage = 2.4 times the rated voltage for AC test or 3.4 times the rated voltage for DC test Test Time = 1 second |
Continuity Test (Ground Bond Test) Test Current Requirement = 150% of the maximum current of the circuit under test or 25 A Test Time = 5 s seconds No load voltage = ≤60 Vdc
Pass Criteria: The grounding system shall have no more than 0.1 Ω resistance
|
Continuity Test Requirement: Simple continuity, resistance not exceeding 0.1 Ω
|
Safety Compliance Analyzer to meet your Standard:
|
Safety Compliance Instrument to meet your Standard: |
HypotULTRA® Model 7804 AC / DC Hipot, 40A Ground Bond, Insulation Resistance, Ground Cont.
|
Hypot® Model 3870 AC / DC Hipot, Insulation Resistance, Ground Cont.
|
The attached file